Inland Pacific, Blosser Street Bridge, Santa Maria, CA
Subgrade preparation and placement of pre-fabricated concrete bridging system. All preparatory work was performed in order to support a single night closure of Blosser Road. Extreme care was required to place the bridging system due to the proximity of high voltage electrical wiring overhead. |
|